  1. Input instruction is further refined. July, 2005


  2. Safety Function Status Check procedure is added. July.2005

  3. Home page moves to www.treeflowchart.com. Jan.2002.

  4. Variables for the values are now declared in the XML Database for integrity. Dec.2001.

  5. The column for the device symbols in the process pane is aligned to the right side. Backgroundcolor changes when a device symbol is selected. Nov.2001.

  6. Procedures can be wriiten in in your language. Especially Korean procedures are successfully tested. PML parser was modified to handle localized characters. Nov.2001.

  7. Input statement has its logic. Nov.2001.

  8. The images of ImPRO are converted into transparent GIFs. Oct.2001.

  9. When the equation of autocheck is wrong, the autocheck behaves like mancheck. Oct.2001.

  10. Finish command is linked with procedure close dialog. Oct.2001.

  11. Initiate command is linked with procedure open dialog. Oct.2001.

  12. The arrows of flowchart become dynamic according to the result of focal action-check. Aug.2001.

  13. ImPRO is supported by KNICS(Korean Nuclear Instrument and Control System) project which is an ambitious project to develop I&C H/W and S/W for nuclear power plant. CBP, Protection system, DCS, and CEDMCS are some of the targets. Oct.2001.

  14. Set command can be evalated with automatic evaluator. Oct.2001.

  15. The next action check symbols are selectable, so quick procedure execution is possible. Proxy symbob is also selectable. Aug.2001.

  16. Input user interfaces for number and boolean are different. Aug.2001.

  17. Text in the logic tree is automatically wrapped. May.2001.

  18. XML database presentation is improved. May.2001.

  19. API(Application Program Interface) is introduced. May.2001.

  20. Standard Post Trip Action and Diagnosis Procedure are added. Apr.2001.

  21. More powerfule autocheck evaluator is introdueced. Apr.2001.

  22. Variable declaration is modified. Apr. 2001. New device symbols are designed. Apr. 2001.